Big Ass FansBig Ass FansBig Ass Fans
Case Studies

WAREHOUSE / DISTRIBUTION CENTER Click to go to Industry page

UNITED STATIONERS WAREHOUSE
Greenville, IL

Problem: Employees were sweltering in the summertime, melting away morale and productivity. In such a vast space individual floor fans became too costly and a safety hazard.
Click here to read this testimonial in its entirety.
OFFICE MAX POWERMAX DISTRIBUTION CENTER
McCalla, AL

Problem: With a large space too expensive to air condition, a cost-effective alternative was needed to keep employees comfortable.
Click here to read this testimonial in its entirety.
Union Beverage Distributors
Chicago, Ill

Problem: Employee productivity was dropping as temperatures were soaring. An efficient cooling solution was needed.
Click here to read this testimonial in its entirety.

MANUFACTURING Click to go to Industry page

LOCK JOINT TUBE
Chattanooga, TN

Problem: During the cold Tennessee winters, the plant with its 65 foot ceiling became impossible to heat.
Click here to read this testimonial in its entirety.
McCAIN FOODS
Carberry, MB, Canada

Problem: Due to the hot and cold areas, condensation was becoming a health and safety issue by either freezing or growing mold on the ceiling.
Click here to read this testimonial in its entirety.

ATHLETIC Click to go to Industry page

BEN HILL GRIFFIN STADIUM aka "The Swamp"
Gainesville, FL

Problem: Florida is hot, dangerously so. With game day temperatures regularly reaching 100 degrees or higher, gator fans were at real risk for heat related illnesses.
Click here to read this testimonial in its entirety.
GREEN BAY PACKERS' LAMBEAU FIELD
Green Bay, WI

Problem: Hot air was trapped at the top of the structure. People in the atrium were very cold at ground level when Wisconsin temperatures dropped.
Click here to read this testimonial in its entirety.

DAIRY AND EQUINE Click to go to Industry page

LAKESIDE ARENA
Frankfort, KY

Problem: During hot summer months there was no breeze and during the winter months, their heat wasn't always where it needed to be.
Click here to read this testimonial in its entirety.
PYLE DAIRY FARM
Zeeland, MI

Problem: Airflow was needed within the 160 stall barn to keep the cows happy and productive, while being cost-efficient and quiet.
Click here to read this testimonial in its entirety.

AVIATION Click to go to Industry page

ALCOA FUJIKURA Corporate Hangar
San Antonio, TX

Problem: With unforgiving summer temperature and problems with condensation forming on the plane, air movement was needed.
Click here to read this testimonial in its entirety.
NASA's LANGLEY RESEARCH CENTER BUILDING 1244
Hampton, VA

Problem: The all metal structure became an oven on hot summer days and people are routinely on the hangar floor to notice the extreme temperatures.
Click here to read this testimonial in its entirety.

ARCHITECTURE / ENGINEERS / COMMERCIAL / RETAIL Click to go to Industry page

ACADIANA DODGE
Lafayette, LA

Problem: Acadiana Dodge is not an air conditioned shop and it would be cost prohibitive to air condition the entire automotive shop area.
Click here to read this testimonial in its entirety.
THE ORANGE PEEL
Asheville, NC

Problem: When large crowds would gather in The Orange Peel for performances, the airflow in the club became restricted and uncomfortable.
Click here to read this testimonial in its entirety.
PET CAMP
San Francisco, CA

Problem: Pet Camp had serious ventilation and noise issues. An energy-efficient product was needed to help them meet their Green Business standards.
Click here to read this testimonial in its entirety.
CHANDLER-GILBERT COMMUNITY COLLEGE
Chandler, AZ

Problem: When the new Student Center was designed, the architects wanted to create a truly indoor/outdoor space that was both comfortable and usable.
Click here to read this testimonial in its entirety.
footer footer footer